KPI & Calculator Pack
OEE, time study, scrap cost, capacity, ROI and a manufacturing KPI dashboard.
Asset register, PM schedule, work orders, lubrication and spare parts control.
A working preventive maintenance system rather than a folder of blank forms. The asset register feeds the PM schedule, the schedule produces the work orders, and the downtime analysis rolls up to a number you can put in front of a plant manager.
The daily operator check is the piece most PM programmes are missing: the cheapest inspection in the building is the one the person already standing at the machine does before they start.
Built for shops that do not have a CMMS — and a reasonable way to work out what you would want from one before you buy it.
No. It is designed for shops that do not have one.